Projects

2018 Street Program


Several streets will be resurfaced in 2018 as part of the annual street program. Streets are chosen for rehab based on several factors including pavement condition, age of pavement, rehab history of the pavement, traffic volume, and recommendations from the City's pavement management system.

2018 STREET PROGRAM - STREET LIST
2018 STREET PROGRAM - MAP

PAVEMENT TREATMENT TYPES



Curb, Sidewalk & Approach Program (CSA)


Curb, sidewalk and approaches are being replaced this spring/summer throughout the City on streets selected for the 2019 Street Resurfacing Program. 
2019 CSA PROGRAM - PROPERTY MAP

 
Dayton-Yellow Springs Road / I-675 Improvements


This project includes additional and/or lengthened turn lanes, improvements to signal timing, improved pedestrian access across the bridge over I-675, and improved striping. Construction is scheduled for 2018.
DYS / I-675 INTERCHANGE - PROJECT INFORMATION SHEET


Colonel Glenn / Kauffman Roundabout


The intersection of Colonel Glenn Highway and Kauffman Avenue will be reconstructed in 2019 to provide improved vehicle and pedestrian safety and more efficient traffic flow, and safer pedestrian access.  The improved intersection will utilize a roundabout for traffic control in place of the outdated traffic signal.
COL GLENN / KAUFFMAN ROUNDABOUT - PROJECT INFORMATION SHEET 
COL GLENN / KAUFFMAN ROUNDABOUT PROJECT WEB PAGE
COL GLENN / KAUFFMAN ROUNDABOUT - CONCEPTUAL DRAWING

Kauffman Avenue Widening


Kauffman Avenue will be improved in 2019 from Colonel Glenn Highway to Lindberg Drive.  Improvements include but are not limited to; full depth pavement repairs, an additional lane between High Street and Lindberg Drive. pavement resurfacing, drainage improvements, and a new traffic signal at the Garland Avenue / Kauffman Avenue intersection.
KAUFFMAN WIDENING - PROJECT INFORMATION SHEET

Yellow Springs-Fairfield Road Improvement Project


An improvement project for Yellow Springs-Fairfield Road from Spangler Road to the eastern corporation limit (just east of Warm Springs Drive) is scheduled for construction in Spring 2020.  Potential improvements include but are not limited to; pavement widening, asphalt resurfacing, new curb and gutter, storm water improvements, a new sidewalk, a new multi-use path, and pedestrian crossing facilities at Roehner Drive, Astoria Boulevard, Black Lane and Warm Springs Drive.
YSF - PROJECT INFORMATION SHEET
YSF - PROPOSED DETOUR PLAN

Project Documents